The return requirement writes the budget

Income supports the budget

Supported total cost$33.33MSelected total cost$32.8MSigned budget gap$533.3kSelected total:LandHardSoftAnnual NOI$2MRequired yield6 %Hard cost / GSF200 $/SFLand basis$4M

Examples play automatically. Drag the orange terms in the drawing; arrow keys edit the same assumptions.

Annual NOI: $2M · Required yield: 6% · Hard cost / GSF: $200/SF · Land basis: $4M

Illustrative 120,000 GSF project. Required yield is annual NOI divided by total cost. Hard cost covers all gross area; soft costs are assumed at 20% of hard cost. No debt, fees beyond that allowance, taxes or exit value are modeled. A negative budget gap means the selected assumptions do not fit.