A real section through one floor-to-floor

Tight PT slab

ConcreteSteel + deckDuct under beamDuct through beamslab 7 inservices 17 inclear 108 infloor-to-floor 11.29 ftclear height drawn at 40% scalefinished floor, level abovefinished floor, this levelsupply duct 10 inPost-tensioned concreteslab, 7 inNo beam below the slabSprinkler main, 4 inSupply duct, 10 in high, 1in insulation each sideWire hangers from the slababoveTrapeze hangers from theslabSuspended ceiling grid andtileFinished ceiling lineFinish floor, 1.5 inslab 7 + plenum 17 (structure 0 + services 17) + ceiling 2 + clear 108 + finish 1.5 = 135.5 in, 11.29 ftEach extra inch of floor-to-floor: 400 SF of facade over 12 floors, $3,667 a floor, $44,000 in all.

Drag the slab underside, the beam bottom, the duct bottom or the floor line. Use the buttons for concrete or steel and for routing the duct under or through the beam. Arrow keys edit the same values.

Slab and concreteSteel beamSupply ductSprinkler mainCeiling grid and tileFinish floor

Section through one floor · 400 ft of perimeter · 12 floors · $110 per SF of facade

Clear height: 108 in · Structure below slab: 0 in · Duct: 10 in · Slab: 7 in · Concrete · Duct below the beam

Assumptions, not a structural or code design. Floor-to-floor = finish floor 1.5 in + slab + plenum + ceiling assembly 2 in + clear height. Plenum = structure below the slab + services below it. A duct hung under the structure sits 2 in below it, with 1 in of insulation on each side and 3 in of clearance above the ceiling grid. A duct may pass through a beam web opening only if its insulated height is at most half the beam depth (an assumed limit); the plenum is then the beam depth plus 3 in. A 4 in sprinkler main rides in the bay and never sets the depth. Sections are drawn schematically. Facade cost assumes a 400 ft perimeter (120 × 80 ft), 12 floors and $110 per SF of facade, and ignores everything else that scales with height. Slab dead load assumes normal-weight concrete at 150 lb/ft³; a composite deck's 1.5 in flutes count as half concrete, plus about 3 psf of deck. The reference is the tight PT slab.