Trades meet at physical interfaces
A coordinated ceiling zone
Drag the beam bottom, duct bottom or ceiling line. The exact missing clearance updates.
Current geometryDirect edit / changed part
Beam 12 in + duct 16 in + 2 in separation = 30 in required zone. Framing, duct routing and ceiling position share this interface.
Hypothetical section measured in inches. A rectangular beam and duct share a vertical zone with a stated 2-inch separation. This checks one spatial interface; it does not simulate a whole construction project or certify an installation.