Skip to content

Parcel Sort, Set Size, Frontage Preset

See How Many Standard Sort Hubs Your Frontage Can Serve

Start from a set-size parcel sort hub with trucks served from the frontage, repeated across your parcel. You see how many hubs and dock doors fit before you tie up the land.

Parcel Sort, Set Size, Frontage, 3D orbit of the site layout

Will a Set-Size Parcel Sort Hub Fit My Site?

TestFit is real estate feasibility software that generates site plans on your parcel and calculates what they yield. For a compact parcel sort hub, the answer comes down to three things that are hard to judge from a parcel map.

  • One hub size, repeated

    Every hub is the same set size, so yield moves a whole building at a time. A little more depth or frontage can decide whether the site holds one more hub, or any at all.

  • Truck access from the frontage

    With no on-site loop, every trailer enters from the frontage road. How much usable frontage the parcel has, and where trucks can enter, limits how many hubs it can serve.

  • Depth behind the street

    Each hub needs room for the building, its truck courts and trailer parking behind the frontage road. Parcel depth decides whether a second hub fits.

From Your Parcel to a Deal You Can Underwrite

Start from the parcel sort hub your team would build, tune it to your standards, and finish with one model for the site, plan, tabulation and pro forma.

  • TestFit site inputs: parcel boundary with setbacks, flood zone and wetland easements, and elevation contours

    1. Inputs

    Your parcel and its constraints

    • Site boundary: pick the parcel from built-in parcel data with current owner info, draw it, enter metes and bounds, or import a KML/KMZ file
    • Setbacks and frontage: front, side and rear setbacks set to the parcel edges
    • Zoning: FAR, building and impervious coverage, height limits and parking ratios, pulled in for your parcel so you don't have to dig through the zoning code
    • Easements: areas the layout keeps buildings out of
    • Site conditions: flood zones, wetlands and topography from Site Intelligence

    Every layout starts inside your site's real constraints.

  • Parcel Sort, Set Size, Frontage, 3D layout with set-size parcel sort hubs and trucks served from the frontage

    2. Generated layout

    Your product, fine-tuned on the site

    • Product: 1-story parcel sort hubs, 36 ft clear, fixed at 260k sf
    • Site layout: truck courts, trailer and car parking, trucks served from the frontage
    • Your edits: buildings, docks, courts, parking and circulation

    You see the building your team would propose, on your parcel.

  • Parcel Sort, Set Size, Frontage, 2D site plan generated in TestFit

    3. Outputs

    A source of truth for the deal

    • Site plan geometry: buildings, courts, parking and drives drawn to the parcel
    • Tabulation for this product: building sf, dock doors, trailer and car stalls against what's required, site coverage and FAR
    • Earthwork: cut and fill for the layout
    • Financials: the geometry turned into development costs, revenue and returns
    • Shareable results: a link or PDF report for your team, partners and other stakeholders

    You know whether the deal works, with numbers to back it.

TestFit is transformational. We've shaved days off of our analysis by using the AI capabilities of this software, which allows us to make smarter decisions faster.

Luke Peters Vice President of Development

Compact Parcel Sort Hub Site Planning FAQ

What is a parcel sortation hub?

A building where parcels arrive by trailer, are sorted by destination and leave on outbound trailers.

How is this different from the other parcel sort layouts?

The other parcel sort layouts size buildings across a range and add a perimeter truck loop. This one repeats one set-size hub and serves trucks from the frontage, so it suits a tighter site.

Can a parcel sort hub work on a tighter site?

It depends on depth and frontage. The parcel has to fit the building, its truck courts and truck access from the street. Load your parcel in TestFit with this layout to see if it fits.

What does frontage-served mean?

Trucks enter the site from the frontage road, with no on-site truck loop. It leaves more land for building and parking, and keeps truck traffic on the street side of the site.

Can I change the layout after it generates?

Yes. Start from this layout, then edit buildings, docks, courts, parking and circulation in TestFit. The site plan and yield recalculate as you go.

Find it in TestFit

Preset name
Parcel Sortation XS - Multi - Frontage-Served
In-app description
1 Story; 36 ft Clear; XS Building, 260k sf; Trucks Served from Frontage

Test This Layout on Your Next Industrial Site

Load your parcel and get the site plan, yield, and costs in one place.