Production Homes, Rear Alley
Test Production Homes with a Rear Alley on Your Site
Two-story, 4BR homes with 2-car garages moved to a rear alley. See how an alley changes the home count and the street scene.
Will Production Homes with a Rear Alley Work on My Site?
TestFit is real estate feasibility software that generates site plans on your parcel and calculates what they yield. For a production single-family community, the answer comes down to three things that are hard to judge from a parcel map.
-
Home width sets the count
Garage width, side yards and home width decide how many homes line each street.
-
Streets take a big share
Every home needs frontage, so street length grows with the home count.
-
Product mix changes yield
Ranches, two-story homes and narrow starters lay out differently on the same site.
From Your Parcel to a Deal You Can Underwrite
Start from the layout your team would build, tune it to your standards, and finish with one model for the site, plan, tabulation and pro forma.
-
1. Inputs
Your parcel and its constraints
- Site boundary: built-in parcels with owner info, drawn, metes and bounds, or KML/KMZ
- Setbacks: front, side and rear, set to the parcel edges
- Zoning: FAR, coverage, height and parking ratios, pulled in for your parcel
- Site conditions: easements, flood zones, wetlands and topography from Site Intelligence
Every layout starts inside your site's real constraints.
-
2. Generated layout
Your product, fine-tuned on the site
- Product: 2-story, 4BR homes with 2-car garages off a rear alley
- Home size: 40 ft wide by 50 ft deep
- Site layout: two-car garages load from a mews lane behind, so the street side is front porches
- Your edits: home types, streets, alleys and parking
You see the community your team would propose, on your parcel.
-
3. Outputs
A source of truth for the deal
- Site plan: buildings, streets, alleys and parking on the parcel
- Tabulations: units by type, parking stalls against requirements, density and coverage
- Financials: a live pro forma of development costs, revenue and returns, with per-formula editing as needed
- Sharing: a link or PDF report for your team and partners
You know whether the deal works, with numbers to back it.
TestFit automates the manual process of testing development feasibility and saves us many hours of manual work. This allows us to run more scenarios and alternatives for every project. It also creates better, more accurate basic massing visuals than we can do manually.
Production Homes, Rear Alley Site Planning FAQ

Test This Layout on Your Next Single-Family Site
Load your parcel and get the site plan, yield, and costs in one place.