TestFit 5.27: Directed Variation in Townhome Site Planning

Written by Ryan Butler

TestFit 5.27 over an aerial view of townhome rows on a street.

Share article

Lower density housing sells on variation. Lot widths change down a block, a duplex lands where the corner calls for one, and garages come off an alley because of how the street is meant to read. Higher up the density ladder the same holds in section, where a podium either carries the building above it or carries open sky. TestFit 5.27 puts built form on the plan, from the first step of a deal through the ground underneath it.

Deal Setup Updates

Guided Deal Setup

A deal runs as six steps in a side panel: lock the feasibility area, define the site, set allowed types, set allowed presets, set performance filters, and explore the solution space. Each step scopes the one that follows, so the panel sets the bounds of the search the solver runs.

Locking the area is free, site tools stay inactive until it is set, and credits apply only to premium configurators, with the cost and the remaining balance shown before anything is spent. Testing a site costs nothing, and spend happens on a confirmed action.

The options that come back already sit inside the zoning and cost limits the deal has to hold to, and reaching that point from an empty canvas takes no training.

Watch an overview of Guided Deal Setup:

Housing Updates

Townhome Product Mix

A townhome library carries its own inline units, end caps, and single buildings, and a run fills either from a weighted mix of those units or from a run type that fixes a chosen end cap on each side. Product comes from that library, or from numbers alone, which is enough to test a mix against a site before a unit is drawn. Widths, depths, and heights change down the row the way they do in a community that was designed house by house.

Clusters spread those products across one drive by share, down to a single building, each with its own setbacks, parking ratio, and gaps, so a range of house types sits on one plan with the share behind each one visible. An individual run or a full block can also be swapped to a different cluster by hand, placing premium product on the perimeter and frontage lots that carry it while the rest of the layout keeps solving. The unit mix in the model is the unit mix that goes into the pro forma, and the product plan and the site plan stay the same document, which is what holds up with partners, lenders, and jurisdictions.

A townhome site plan solved with three clusters of different products, set by share in the clusters table.
Clusters spreading three townhome products across one site by share
Inline and end cap live-work units in a townhome unit library.
Inline units, end caps, and run types in a townhome unit library
Townhome rows in 3D with unit types colored by width as the inline and end cap mix is edited.
Editing unit widths and mix, with rows re-solving at varied widths and heights

Alley-Loaded Townhomes

Townhome rows can load from a shared alley behind the row, garages on the rear face and the front door on the street. The alley is defined by its own road section and setback, the same way a street is, and rows sit against their back edge so extra depth falls to the front yard. Front loaded product stays available for the markets that build it that way.

Alley width and setback are decisions on the plan, so changing either one resolves the whole block and front loaded and rear loaded schemes are studied against the same parcel. A rear loaded block that took a consultant days to draw in CAD gets tested in an afternoon. The street frontage reads the way these communities are designed and sold.

A double shotgun townhome block switching from front loaded to alley loaded.
Switching a block of double shotgun homes from front loaded to alley loaded
Stacked urban townhome rows switching to rear loading from a shared alley.
Stacked townhomes loading from a shared alley behind each row

Parking and Structure Updates

Building-Fit Podium

A control on the garage layer fits a podium to the exterior walls of the building above it. The building solves first, its walls become the garage outline, facade notches shallower than a stall width are squared off, and an offset pushes the podium past those walls or pulls it in beneath them. Stalls, aisles, ramps, roof, and parapets lay out inside the corrected shape.

Podium area carries building instead of open sky, and parking counts come from the building footprint rather than a hand drawn approximation. The extent stays a choice, so schemes compare on yield without a redraw, and the fit holds as the floors above change.

A podium garage outline snapping to the exterior walls of the courtyard building above it.
Podium Follows Building fitting the garage to the building walls above

Site and Grading Updates

Proposed Grade Contours

Contours of the proposed grade draw over the cut and fill view wherever the site is graded, and both existing and proposed contours export to DXF and SVG, with a grading page added to the PDF for sites with topography.

The finished ground is legible in the plan rather than inferred from a color gradient, and an engineer gets contours that build a surface in Civil 3D.

A mixed-use site plan with labeled proposed grade contours drawn around the building and parking.
Proposed grade contours drawn over the site plan

→ Book a demo to see these updates on your site.

About Author

Ryan Butler is a Product Marketing Manager at TestFit with a background in architecture spanning prefab, residential design, and feasibility studies for developers. He's spent his career at the intersection of design and technology, bringing hands-on design experience into how TestFit talks about its products. He's passionate about the AEC tech industry and where design and technology are headed together.

‍

Ryan Butler Product Marketing Manager TestFit