Essay · September 4, 2024

Room Based BIM II, Part 2

Author
Clifton Harness
Date
September 4, 2024
Address
/harness-architecture/room-based-bim-ii-2
Interactive study Service demand accumulates across selected rooms

Room of Requirements

Below is a table of how I might begin with room based services. Today, I’m primarily worried about life safety, as that will drive door sizing (minimums) between rooms, and an active life safety algorithm will need to be a part of this for anyone to trust it. Rooms with smaller occupant load factors (fewer square feet per person) will require more doors/exits per unit of size. Also noted is some form of the required services that those rooms will have.

Room Name Live Load (Bar) Live Load (Numeric) Water Power Wastewater Gas HVAC Air
Mechanical Room ██████████ 150 psf ○ ● ○ ○ ●
Fire Pump Room ██████████ 150 psf ● ● ● ● ●
Storage Room ████████ 125 psf ○ ● ○ ○ ○
Electrical Room ███████ 100 psf ○ ● ○ ○ ●
Server Room ███████ 100 psf ○ ● ○ ○ ●
Corridor █████ 80 psf ○ ● ○ ○ ●
Break Room ███ 50 psf ○ ● ○ ○ ●
Conference Room ███ 50 psf ○ ● ○ ○ ●
Garage ███ 50 psf ○ ● ○ ● ●
Office ███ 50 psf ○ ● ○ ○ ●
Utility Room ███ 40 psf ● ● ● ● ●
Entry/Foyer ███ 40 psf ○ ● ○ ○ ●
Bathroom ███ 40 psf ● ● ● ○ ●
Janitor’s Closet ███ 40 psf ● ● ● ○ ●
Restroom ███ 40 psf ● ● ● ○ ●
Dining Room ███ 40 psf ○ ● ○ ○ ●
Living Room ███ 40 psf ○ ● ○ ○ ●
Kitchen ███ 40 psf ● ● ● ● ●
Closet ██ 30 psf ○ ● ○ ○ ●
Bedroom ██ 30 psf ○ ● ○ ○ ●

Given the code, the minimum door needs to be 32″ wide, which can serve up to an ungodly large bedroom for exiting, but not even enough for 1000 SF of standing-room assembly space.

The code is controlling for owners that are making fire traps, and being reasonable that even a 20×20 bedroom doesn’t need more than one exit.

This lead me on a wild journey through the code to find some kind of value to a door, but alas, I think we need to split the analysis into buildings with one door, and buildings with two plus doors. The proof is that Egress path width requirements clearly make that first door (32″ minimum) clearly needed. Massive data table below to consider.

Door Width (clear opening) Occupancy Type Occupant Load Factor Width (in) Door Area (sq ft) Occupancy Load Limits Per Door Required Exits Sprinkler System Travel Distance
32″ Assembly (Concentrated, unsprinklered) 7 0.2 1,120 160 2 No 200 ft
32″ Assembly (Standing, unsprinklered) 5 0.2 800 160 2 No 200 ft
36″ Assembly (Concentrated, unsprinklered) 7 0.2 1,260 180 2 No 200 ft
36″ Assembly (Standing, unsprinklered) 5 0.2 900 180 2 No 200 ft
42″ Assembly (Concentrated, unsprinklered) 7 0.2 1,470 210 2 No 200 ft
42″ Assembly (Standing, unsprinklered) 5 0.2 1,050 210 2 No 200 ft
48″ Assembly (Concentrated, unsprinklered) 7 0.2 1,680 240 2 No 200 ft
48″ Assembly (Standing, unsprinklered) 5 0.2 1,200 240 2 No 200 ft
32″ Assembly (Concentrated, sprinklered) 7 0.2 1,120 160 2 Yes 250 ft
32″ Assembly (Standing, sprinklered) 5 0.2 800 160 2 Yes 250 ft
36″ Assembly (Concentrated, sprinklered) 7 0.2 1,260 180 2 Yes 250 ft
36″ Assembly (Standing, sprinklered) 5 0.2 900 180 2 Yes 250 ft
42″ Assembly (Concentrated, sprinklered) 7 0.2 1,470 210 2 Yes 250 ft
42″ Assembly (Standing, sprinklered) 5 0.2 1,050 210 2 Yes 250 ft
48″ Assembly (Concentrated, sprinklered) 7 0.2 1,680 240 2 Yes 250 ft
48″ Assembly (Standing, sprinklered) 5 0.2 1,200 240 2 Yes 250 ft
32″ Educational 20 0.2 3,200 160 2 Yes 250 ft
36″ Educational 20 0.2 3,600 180 2 Yes 250 ft
42″ Educational 20 0.2 4,200 210 2 Yes 250 ft
48″ Educational 20 0.2 4,800 240 2 Yes 250 ft
32″ Business 150 0.2 24,000 160 2 Yes 300 ft
36″ Business 150 0.2 27,000 180 2 Yes 300 ft
42″ Business 150 0.2 31,500 210 2 Yes 300 ft
48″ Business 150 0.2 36,000 240 2 Yes 300 ft
32″ Industrial 100 0.2 16,000 160 2 Yes 250 ft (F-1), 400 ft (F-2)
36″ Industrial 100 0.2 18,000 180 2 Yes 250 ft (F-1), 400 ft (F-2)
42″ Industrial 100 0.2 21,000 210 2 Yes 250 ft (F-1), 400 ft (F-2)
48″ Industrial 100 0.2 24,000 240 2 Yes 250 ft (F-1), 400 ft (F-2)
32″ Mercantile 60 0.2 9,600 160 2 Yes 250 ft
36″ Mercantile 60 0.2 10,800 180 2 Yes 250 ft
42″ Mercantile 60 0.2 12,600 210 2 Yes 250 ft
48″ Mercantile 60 0.2 14,400 240 2 Yes 250 ft
32″ Storage 300 0.2 48,000 160 2 Yes 250 ft (S-1), 400 ft (S-2)
36″ Storage 300 0.2 54,000 180 2 Yes 250 ft (S-1), 400 ft (S-2)
42″ Storage 300 0.2 63,000 210 2 Yes 250 ft (S-1), 400 ft (S-2)
48″ Storage 300 0.2 72,000 240 2 Yes 250 ft (S-1), 400 ft (S-2)
32″ Healthcare 240 0.2 38,400 160 2 Yes 200 ft (I-2)
36″ Healthcare 240 0.2 43,200 180 2 Yes 200 ft (I-2)
42″ Healthcare 240 0.2 50,400 210 2 Yes 200 ft (I-2)
48″ Healthcare 240 0.2 57,600 240 2 Yes 200 ft (I-2)
32″ Small Assembly/Business Areas <50 occupants 0.2 N/A <50 1 No 75 ft (common path)

End of essay · Clifton Harness · September 4, 2024